Manufacture Intern

BOHN, manufacturing department, 2020

Multidiplinary team with a series of projects leading to the optimization of the manufacturing process of "special coils" used in refrigeration equipment.


Assembly table

After finding the bottleneck of the production line, we determined the model change was slowing the line and also the cause for down time. By designing an attachment to the current table and implementing it, we reduced the model change operation time by 70%.

Transportation

We found an opportunity area in the transport of the biggest coils through the assembly line. In the operation they'd need at least three workers to move the coil, but with our proposal with cranes, the operation would require only one worker.